mbie-call-for-comment

Call for comment – MBIE consultation for proposed changes to B1/VM1 and B2/AS1

Over the last six months, HERA have worked closely with SCNZ and MBIE to get value from the significant investment made in developing the new composite design standard (AS/NZS 2327) and durability technical specification (NZS TS 3404) by having them referenced in B1/VM1 and B2/AS1 of the New Zealand Building Code. It’s important that you…

canada-street-bridge

Structural steel enables world first bridge design – SCNZ | Hawkins Infrastructure | Novare Design | PFS Engineering

Through our relationship with SCNZ, we’re excited to share a recent case study distributed by them which profiles the amazing work on the Auckland Canada Street Bridge/Nelson St Cycleway project for NZ Transport Agency. This work was delivered by our members Design Team Leader and Structural Engineer Novare Design, Structural Steel Contractor PFS Engineering and…

building-performance-b1vm1

Notice – B1/VM1 Amendment 16 now published

Over the last 12 months, HERA have worked closely with SCNZ and MBIE to update steel industry standards referenced in the Acceptable Solutions and Verification Methods (B1/VM1) of the New Zealand Building Code. These amendments to B1/VM1 relate to minimum standards for fabrication and erection; structural steel products and expanding the choice of high strength…